Switching from a project tracker

VelorStrategy ·

Project trackers tend to fill up with two different kinds of thing: the structure of the work, such as projects, milestones and risks, and the small daily to-dos that move it along. A good move separates them, because they belong in different places and they age at different speeds.

Where it goes

The structure goes to the PMO desk, where Marlowe is the agent. PMO holds projects, charters, milestones, risks, decisions, change control, status reports, stage gates, the portfolio and benefits. The daily to-dos go to Atrium Tasks, the shared to-do list everyone in the company uses.

From the old toolGoes toNotes
Projects or boardsPMO: projectsName, owner, status, start, target date.
Milestones or epicsPMO: milestonesLinked to the project, with a due date.
Risks and blockersPMO: risksDescription, owner, likelihood, impact, response.
Decisions noted in commentsPMO: decisionsWorth pulling out by hand; they are often buried.
Open tasks and cardsAtrium TasksTitle, assignee, due date. Open ones only.
Project briefsPMO: charters, or DocsThe why, the scope, the success measure.

What to export

Most trackers export to a spreadsheet, either the whole workspace or one project at a time. Export projects and tasks separately if you can. If the tool only exports one flat list of tasks with a project column, that works too: you can split it in a spreadsheet before import.

Look for the columns that carry structure: parent item, milestone, label or tag. Labels are often where teams hid risks and blockers. Filter on them and save those rows as their own sheet.

What to move first

Start with active projects only. For each one, bring the project record, its open milestones and any live risks. Then bring the open to-dos into Atrium Tasks. A project that is in PMO with its milestones but without its to-dos is still useful. To-dos without their project are not.

If you run many projects, pick the two or three the owner reviews most often. Getting their status reports out of PMO in the first week is the fastest way to prove the new home works.

What to leave behind

How the import works in Move in

Every import runs through the Move in page in Atrium. You bring a spreadsheet or an export from any tool, as a CSV or .xlsx spreadsheet file. Velora reads the column headings and suggests how each column matches a field on the desk. You confirm or correct each match. The rows then arrive as drafts under "Ready for your review", and nothing is saved until you approve them. If a column has no obvious home, it is left for you to decide rather than guessed.

For project data, check dates carefully. Trackers export dates in different formats, and a milestone that lands a month off is easy to miss. Look at a handful of drafts before you approve the batch.

After the move

With projects in PMO, you can ask Marlowe for a status report, a risk review or a change request, and the draft waits for your review. Marlowe does not change a project's status, close a milestone or reassign work by itself. The project owner still decides, and every draft is theirs to approve. You initiate, Velora drafts and surfaces, you approve and sign off.

Meeting notes and to-dos from meetings held in Atrium Calendar can feed the same task list, once the host approves them. Over time, that means fewer to-dos living in someone's notebook.

Checklist

Move in at your own pace

You initiate. Velora drafts and surfaces. You approve and sign off.

Start free, open Move in, and bring over one desk at a time. Nothing lands in your records until you approve it.

Start Free Plans & Pricing